Monday was the first day of our project work. We met for breakfast at 6 AM and then met in the lobby to travel to the Rise Above centre.
Our team really came together. We fell into a really great groove that allowed us to be safe, productive and comfortable.
We worked on the main project of laying a concrete pad in four mini projects today:
- Dig a trench for a drainage pipe.
- Level out a high corner of the pad area.
- Dig out and replace a damaged drainage pipe.
- Dig a trench for a footing for a retaining wall
Around 11 AM Jenny served us lunch of chicken and rice. It was delicious and well received. After lunch, we drove back to the hotel in chaotic traffic, Each of us raved about how good it felt to shower. After our shower break, we met for refreshments and discussion at the hotel restaurant guided, of course, by Robin and her binder.